Nova Luxe Homes — DFW project photograph

Structural Framing

The Part Of The House Nobody Ever Sees.

Self-performed framing across DFW — residential, commercial and trade-partner packages.

Framing

Everything you love about a house sits on the frame.

Flat floors, square openings, tall volumes and ceilings that do not crack all trace back to how the frame was laid out and executed.

Nova Luxe employs its own framing crews. That means one schedule, one standard and one company answering for the structure.

Nova Luxe Homes — DFW project photograph

Self-Performed

Our crews, our equipment, our schedule.

We are not brokering your frame to whoever is available. The same superintendent who set the schedule is on site when the walls go up.

  • In-House Crews — Employed framers, not week-to-week labor.
  • Engineered Layout — Spans, headers and point loads verified before cutting.
  • Inspection Ready — Framing that passes the first time.
Nova Luxe Homes — DFW project photograph

Featured Scope

Foundation-To-Dry-In Shell

A single-source structural package for a builder client: engineered slab, full frame and dry-in released to finish trades on schedule.

  • Type: Trade Package
  • Location: DFW
  • Scope: Slab + Frame + Dry-In
  • Delivery: On Committed Date

Process

From Plan Review To Dry-In.

01

Plan Review

Send the structural set. We review constructability and flag conflicts.

02

Scope + Number

A line-item proposal tied to the drawings, not a napkin allowance.

03

Execute

Our own crews, our own equipment, on the schedule we committed to.

04

Turnover

Inspected, documented and released to the next trade on time.

Our Work

Structure, Documented.

  • Nova Luxe Homes — DFW project photograph
  • Nova Luxe Homes — DFW project photograph
  • Nova Luxe Homes — DFW project photograph
  • Nova Luxe Homes — DFW project photograph
  • Nova Luxe Homes — DFW project photograph

Client Feedback

“Their frame was the cleanest we've taken over in ten years of building.”

Builder Partner · Shell Package — DFW

FAQ

Common questions

Do you frame for other builders?

Yes. Frame-only and foundation-to-dry-in packages are a core part of our business.

Do you handle engineered lumber and steel?

Yes, including LVL, glulam and steel-assisted long-span assemblies.

How fast can you mobilize?

Typically 2–6 weeks depending on scope and season.

Do you provide framing for commercial projects?

Yes — wood-frame and light-gauge packages.

Send Us The Structural Set.

We'll review constructability, flag conflicts and come back with a line-item number.