Bathroom Remodeling
The Quietest Room In The House.
Primary suites and spa baths across DFW — waterproofed correctly, finished beautifully.

Type
Bath Remodel
Location
University Park, TX
Scope
Suite + Structural Rework
Duration
11 Weeks
Baths
Beautiful tile over bad waterproofing is a countdown.
Bathrooms fail behind the wall, not on it. Pan slope, membrane laps, blocking and ventilation decide whether the room lasts five years or twenty-five.
We build the assembly properly, then spend the rest of the budget on the parts you actually see and touch.
- Structural Framing — Self-performed crews — precision from the bones outward.
- Structural Concrete — Foundations engineered for North Texas soil, poured in house.
- Design + Engineering — One team coordinating architecture, engineering and execution.
Scope
Everything behind and in front of the tile.

Primary Bath Suites
Full-suite renovation with closet integration.
Learn more
Waterproofing
Pans, membranes and slope done to spec.
Learn more
Structural Prep
Floor framing for stone and tub loads.
Learn more
Stone + Tile
Layout planned before the first cut.
Learn more
Millwork
Vanities, linen and hardware.
Learn more
Whole-Home Reno
When the suite is part of a bigger plan.
Learn moreFeatured Project
Primary Suite Renovation

- Type
- Bath Remodel
- Location
- University Park, TX
- Scope
- Suite + Structural Rework
- Duration
- 11 Weeks
Reframed floor structure, a curbless wet room and slab stone carried from the shower into the vanity wall.
Process
From Studs To Steam.
01
Walkthrough
We see the house, hear the problem and talk honestly about budget.
02
Plan
Scope, structure, selections and schedule resolved before demo starts.
03
Build
One superintendent, protected finishes and a clean site every evening.
04
Reveal
Punch list closed, warranty in hand, the house back to being yours.
Gallery
Baths Detailed To The Millimeter.
“They tore it back to studs, showed us the waterproofing before it was covered, and finished on schedule.”
Licensed GC
Texas
Self-Performed
Structure
FAQ
Common questions
What does a primary bath renovation cost?
Most primary suites run $55,000–$180,000+ depending on stone, glass, structural work and fixtures.
How long does a bathroom take?
Typically 8–14 weeks of construction.
Can you do a curbless shower?
Yes — it requires floor framing modification, which we self-perform.
Do you handle heated floors and steam?
Yes, including the electrical and ventilation those systems require.
Will you match the rest of the house?
We carry trim profiles, floor levels and hardware finishes through so the suite does not read as a bolt-on.
Bathroom remodeling in Dallas–Fort Worth.
Nova Luxe renovates primary bath suites, guest baths and powder rooms across DFW with correct waterproofing assemblies, structural preparation and slab-stone detailing.
Why bathrooms fail
Nearly every bathroom failure is water finding an unsealed lap, a flat pan or unblocked framing. Those are build-quality problems, and they are solved before tile.
Your Suite Starts Here
Build The Bathroom You Do Not Want To Leave.
Send us the room and a few references. We'll come back with a realistic scope and number.

